A

Corporate Recruiting Manager (Power Generation, Electrical, Data Center Construction)

Adecco United State
Relocation
This Job is No Longer Active This position is no longer accepting applications

Job Description


To expedite consideration, please email your resume to [email protected].


Recruiting Manager – Data Center Construction (Power Generation, Electrical Contracting Engineering, Semiconductor Industry) - a MUST!!


Richmond Virginia (with monthly local travel to HQ and project sites) or Washington DC – Baltimore – Northern Virginia Area | Onsite | Relocation Available!


We’re looking for a high-energy Recruiting Manager to lead high level/senior leadership hiring for one of the nation’s fastest-growing engineering & construction business units. This role is mission-critical — driving workforce growth for large-scale, complex infrastructure projects including data centers, hospitals, airports, and secure government facilities.


Corporate Recruiting Manager (Power Generation, Electrical Contracting Engineering, Semiconductor Industry)


Why This Role?

  • High-visibility role supporting the company’s largest, highest-revenue division
  • Direct succession path — 1 level below Director of Talent Acquisition, with promotion potential in 2–3 years
  • Work in a recession-resistant, rapidly growing sector: data centers & critical infrastructure
  • Lead & produce: manage a strong team of recruiters while still recruiting at the highest levels
  • Gain exposure at the executive and project level across major AEC firms


What You’ll Do

  • Lead recruitment strategy for engineering, electrical/power infrastructure, project management, and superintendent roles on complex, mission-critical construction projects
  • Manage a team of 4 recruiters (10+ years' experience each) while operating as a producing manager
  • Partner with senior leadership in monthly workforce planning and deliver regular talent reports
  • Drive staffing for large-scale projects: data centers, hospitals, airports, secure government facilities, and utilities
  • Attract, engage, and convert talent from adjacent industries (power generation, hydro dams, electrical power infrastructure) into data center construction careers


Technical Proficiency You’ll Need (to recruit effectively)

  • Electrical Power Infrastructure: medium-voltage switchgear, UPS systems, generators, grounding & bonding, dual-path distribution, paralleling switchgear, ATS systems
  • Data Center Environments: high-density power, redundancy/uptime requirements, white space planning, busways, PDUs, branch circuits
  • Mission-Critical Construction: mechanical/electrical contractors, AEC firms, large-scale infrastructure builds


What We’re Looking For

  • 7+ years in recruiting/talent acquisition, with hands-on hiring for electrical power, utility, or data center infrastructure roles
  • 3+ years in a leadership role: managing recruiters while delivering personally on senior requisitions
  • Strong record hiring engineers, project managers, superintendents, and senior leaders in power/critical infrastructure
  • Not solely “title-driven” - proven ability to produce results and build pipelines at scale
  • High EQ, presence with executives, ability to influence at all levels


Compensation & Benefits

  • $150,000 – $180,000 (MAX!) base salary
  • Bonus program: merit-based (2–6%), plus discretionary awards ($10K+ possible, tied to business division & company performance)
  • 3 weeks PTO to start (4 weeks after 10 years)
  • Full stellar benefits package + 401k with immediate vesting
  • Relocation assistance available (to Richmond or DC Metro)
  • Start ASAP in a career-defining role


The Growth Opportunity!!

Step into a succession-proof industry with a chance to transition from utilities and power into the rapidly expanding data center and critical infrastructure sector. In this role, you’ll partner directly with senior leadership, lead a seasoned recruiting team, and build the workforce behind some of the world’s most advanced facilities.


This is a career-defining role for a recruiting leader who excels in high-volume, high-stakes technical hiring. If you’re passionate about driving the talent strategy for complex, mission-critical engineering projects, we want to hear from you.


Equal Opportunity Employer/Veterans/Disabled

To read our Candidate Privacy Information Statement, which explains how we will use your information, please navigate to https://www.adeccousa.com/candidate-privacy


Similar Jobs

Explore other opportunities that match your interests

Senior Systems Engineer – Robotics Technology Deployment (North America)

Networking
2h ago

Premium Job

Sign up is free! Login or Sign up to view full details.

•••••• •••••• ••••••
Job Type ••••••
Experience Level ••••••

Amazon

United State
Visa Sponsorship Relocation Remote
Job Type Full-time
Experience Level Director

Ellucian

United State

Chief Information Officer (CIO) - Oakwood University

Networking
2h ago

Premium Job

Sign up is free! Login or Sign up to view full details.

•••••• •••••• ••••••
Job Type ••••••
Experience Level ••••••

Ellucian

United State

Subscribe our newsletter

New Things Will Always Update Regularly